Design Step 10

Testing and shipment

After all components and subsystems are installed and interconnections are completed, your unit is moved to Air Control's final testing point.

All systems are checked and evaluated by our quality control team. Final inspections are made against your unit's testing and evaluation document.

After passing all inspections, the Air Control label is applied and your equipment is prepared for shipment by common carrier equipped with air-ride shock absorbers.

Your Air Control Microvoid® state-of-the-industry unit is complete and on its way, ready for years of safe and efficient use.